Overview

  Project  /  Construction  Engineer  having  more  than  3  years  of  diversified  experience  including,  recent   § expansion  projects  in  fertilizer  industry  of  Pakistan   Working  knowledge  of  ASME  Sec  VIII  Div  I,  ASME  Sec  V,  ASME  Sec  IX,  Process  Piping  B31.3,  31.8,  TEMA   § and  different  API  and  ASTM  standards  and  recommended  practices   Proficient  at  developing  and  organization  of  job  execution  plans,  quality  plans,  supervising  field  /  site   § supervisors,  directing  assigned  personnel  in  meeting  cost  and  schedule,  trouble  shooting  and  resource   management   Adept  at  conflict ­resolution  and  planning  and  managing  projects  from  inception  through   § commissioning   Experienced  in  supervising  all  levels  of  technicians  and  engineers   § Experienced  in  developing  &  building  relationships  with  international  and  local  contractors  &  vendors   § Well  versed  with  manpower  loading  and  contracting   § PROFESSIONAL   June  2007  ~  Present  

Achievements

  From  the  period  starting  January  2008  till  End  June  2010,  more  than  5  Million  Man ­hours  have  been   § consumed  on  above  projects  under  my  supervision  without  any  LWI  with  a  Total  Recordable  Injury   Rate  (TRIR)  of  0.22   Independently  handled  stand ­alone  projects  whose  cumulative  Cost  exceeds  more  than  USD  15   § Million  and  that  only  in  a  short  span  of  three  years   Successfully  commissioned  all  projects  without  any  delay  hampering  the  schedule  of  start ­up  activities   § of  New  Ammonia  Urea  Plant   Launched  a  “New  at  Site”  Untrained  contractor  Safety  Training  program  for  construction  activities  at   § OSWTU,  SSGC  Gas  Network  in  colonies  and  ETP  project     Runner ­up  in  National  Engineering  Robot  Contest  (NERC ­2005)   § COMPUTER     Application  Software:  Maximo,  Pro|Engineer,  MD  Solids,  MS  Office  

Career History

May 2010 - Mar 2011

  Engro
 Fertilizers
 Ltd.
 Daharki,
 Pakistan
 
Currently
 working
 as
 Project
 Engineer
 on
 worlds
 largest
 single
 train
 Ammonia
 Urea
 complex.
 
FEW
 OF
 THE
 MAJOR
 PROJECTS
 UNDERTAKEN
 ARE:
 

 
1. Plant
 Effluent
 Management
 System
 

 
The
 main
 highlights
 of
 the
 project
 are
 

§ Construction
 of
 85MUSG
 capacity
 pond
 with
 HDPE
 lining
 EPA
 Recommendation
 
 

§ 2.5
 km
 waste
 water
 X
­country
 pipeline
 

§ Installation
 of
 pumps
 

§ Integration
 of
 new
 system
 with
 the
 existing
 system
 
 

§ Laying
 of
 HDPE
 membrane
 of
 approximately
 11,000
 Sq.
 meter
 of
 pond
 area
 
2. Fire
 Water
 Network
 
 
December
 2007
 ~
 Present
 
 

§ Integration
 of
 existing
 Fire
 water
 Network
 with
 the
 new
 Plants
 Fire
 Water
 Network
 

§ Included
 Civil
 works
 for
 New
 foundations
 and
 area
 flooring
 of
 new
 Facility
 

§ Tie
­ins
 on
 live
 circuit
 using
 hot
 tap
 

§ Installation
 &
 commissioning
 of
 New
 Fire
 Water
 pumps
 and
 relocation
 of
 existing
 pumping
 facility
 

§ Critical
 nature
 of
 the
 project
 demanded
 enhanced
 communication
 &
 coordination
 with
 concerned
 
interfaces
 
 

§ 14,000dia
 inches
 of
 piping
 installation
 
3. New
 Ammonia
 Storage
 Facility
 
August
 2009
 ~
 September
 2010
 

§ Assisted
 the
 project
 engineer
 of
 Ammonia
 Storage
 Facility
 during
 the
 construction
 of
 New
 8000
 cu.
 
Mtr
 Double
 Wall
 Double
 Containment
 Ammonia
 Storage
 Tank
 

§ Successfully
 completed
 tanks
 Vacuum,
 Pneumatic
 and
 hydro
­tests
 

§ Found
 opportunity
 to
 lead
 project
 activities
 at
 several
 occasions
 
4. Natural
 Gas
 Receiving
 and
 Distribution
 Facility
 
August
 2009
 ~
 July
 2010
 

§ Erection
 and
 commissioning
 of
 18in
 and
 8in
 Feed
 and
 Fuel
 pipelines
 to
 Primary
 Reformer
 and
 New
 Gas
 
Turbine
 respectively
 

§ Erection
 and
 commissioning
 of
 knock
­out
 drums,
 heat
 exchangers,
 cyclone
 separators
 and
 other
 
equipment
 

§ Integration
 of
 the
 NG
 receiving
 facility
 with
 SNGPL
 Gas
 Supply
 Facility,
 required
 careful
 coordination
 
with
 SNGPL
 personnel.
 Also
 assisted
 their
 teams
 in
 terms
 of
 resources
 and
 manpower
 at
 occasions
 
5. Off
­Site
 Facility
 and
 Cross
 Country
 Piping
 
August
 2008
 ~
 December
 2009
 
3
Project
 is
 designed
 to
 provide
 2000
 m /hr
 flow
 from
 either
 canal
 water
 or
 using
 facilitys
 38
 tube
 wells
 with
 72
 
km
 of
 off
­site
 X
­country
 pipelines.
 The
 project
 involved
 cont.
 on
 next
 page:
 


§ Commissioning
 of
 32/38
 tube
 wells
 

§ Installation
 of
 12
 raw
 water
 tube
 wells
 
3

§ Performance
 test
 runs
 of
 the
 canal
 water
 clarification
 facility
 at
 1200
 
 m /hr
 
6. Onsite
 Water
 Treatment
 Unit
 OWTU
 
December
 2008
 ~
 August
 2009
 
3
Project
 aimed
 at
 providing
 240
 m /hr
 flow
 of
 De
­mineralized
 water
 from
 RO
 trains
 and
 Two
 Bed
 System.
 
Construction
 and
 procurement
 cost
 of
 the
 project
 exceeds
 $5
 Million.
 The
 scope
 of
 the
 project
 involved:
 

§ Managed
 the
 project
 from
 inception
 to
 commissioning
 phase,
 conducted
 design
 reviews,
 involved
 in
 
procurement
 of
 plant
 equipment
 and
 supervised
 the
 project
 construction
 activities
 
3

§ Construction
 and
 commissioning
 of
 internally
 lined
 De
­min
 water
 Storage
 Tanks
 of
 capacities
 100
 m ,
 
3 3
400
 m
 and
 4000
 m
 

§ Construction
 of
 all
 foundations,
 flooring
 and
 roads
 in
 the
 facility
 

§ 17,000
 dia
­inches
 of
 SS
 piping
 and
 900
 dia
­inches
 of
 CS
 piping
 

§ 200
 tons
 of
 equipment
 and
 structure
 erection
 

§ Development
 of
 Quality
 Plans,
 Safety
 plans,
 Rigging
 plans
 and
 Job
 Safety
 Analysis
 for
 one
 of
 a
 kind
 
activities
 
7. Effluent
 Treatment
 Plant
 
December
 2007
 ~
 May
 2009
 

§ The
 construction
 of
 USD
 1Million
 treatment
 facility
 and
 Lift
­off
 stations
 was
 the
 main
 part
 of
 the
 
project.
 

§ uPVC
 piping
 network
 of
 11
 km
 

§ Integration
 with
 the
 existing
 plant
 effluent
 system
 

§ Pre
­commissioning
 and
 commissioning
 activities
 
8. Potable
 Water
 Network
 
December
 2007
 ~
 November
 2008
 

§ Laying
 of
 7
 km
 potable
 water
 network
 for
 new
 housing
 colonies
 

§ Development
 of
 Quality
 Plans,
 Safety
 plans,
 Commissioning
 Procedures
 
9. Gas
 Network
 for
 New
 Housing
 Colonies
 
March
 2008
 ~
 September
 2008
 
Project
 monitoring
 and
 scheduling
 of
 gas
 network
 for
 new
 Engro
 Fertilizers
 Housing
 Colonies.
 The
 undertakings
 
included
 

§ Liaison,
 coordination
 and
 facilitation
 of
 
 Sui
 Southern
 Gas
 Company
 SSGC
 personnel
 

§ Development
 of
 master
 schedule
 and
 updating
 the
 progress
 
 

§ Holding
 meetings
 with
 public
 service
 officials
 of
 SSGC
 in
 Sukkur
 to
 get
 the
 project
 delivered
 on
 time
 

§ Preparation
 of
 progress
 reports
 for
 the
 management
 
 

§ Invoice
 verification
 and
 contract
 management
 

advertisement.